Most Important/Very Urgent
In Order to make necessary arrangements to all the
delegates in our AIC at Vadodara, all the Circle secretaries are requested to send
the consolidated information in below mentioned prescribed proforma in excel
sheet regarding (1) Arrival (2) Departure for all the Delegates / CWC
Members /C.Ss /CHQ office bearers of their Circle who are attending the AIC
at Vadodara-Gujarat before 10th November-2008 on the below mentioned e-mail
addresses,
Resolution adopted by United Forum of Executives of BSNL/MTNL on
repatriation of executives from BSNL/MTNL to DOT
<<<<<Click Here>>>>>>
Programmes
of Organizational actions decided by the United forum of executives of BSNL/MTNL
on the issue of immediate repatriation of executives from BSNL/MTNL to DOT:
A)Saving gram campaign by Branches/SSAs/Circles on 1st
Nov.,08, addressed to Hon’ble MOC&IT. Text of the saving gram;
“United
Forum of BSNL/MTNL Executives’ Associations express serious discontentment &
resentment against non completion of Gr ‘A’ officers’ absorption in BSNL/MTNL.
Strongly demands repatriation of BSNL/MTNL Executives to DoT. Delay in
absorption process is adversely affecting the viability of BSNL/MTNL”.
B)Lunch/Closing hour demonstration at SSA/Circle/Hq level on 7th Nov.,08.
C)Rally at HQs on 18th Nov.,08. Rallies at Circle/SSA HQs
should also be held.
Letter of United Forum addressed to Hon'ble MOC&IT enclosing the resolution
adopted by United Forum.<<<<<<Click
Here>>>>>>>
GS, AGS, Com Khan, and
President/AIBSNL EA had a very extensive discussion with Director (HRD) on
the issues of restrictions proposed to be imposed in terms of educational
qualifications and age in so far as eligibility for appearing in the
internal competitive examination for recruitment of 25% MTs is concerned. We
conveyed in clear terms our opinion and cited the orders of DOP&T and
various judgments of Courts rejecting imposition of any condition on the
basis of age, educational qualification etc. for appearing in internal
competitive examination. However, the discussion remained inconclusive and
is expected to be held again in a couple of days. Streamlining the issues
related to TES Gr B seniority and creating an exclusive cell in personnel
section of BSNL to deal with very complex legal issues relating to TES Gr B
seniority were also discussed, since DOT, on our consistent persuasion, has
finally transferred the issue of TES Gr B seniority to BSNL in totality.
Director (HRD) assured that appropriate action in consultation with DDG(P)/BSNL
will very soon be initiated in this direction and the whole issue of TES Gr
B seniority will be dealt with on utmost priority.
Meeting with Director
(Operations/BSNL)
GS and AGS, Com Khan, met
Director(O) to request him to allow reimbursement of cost of purchase of
mobile sets prior to the issuing of the orders by BSNL Hqs since most of the
executives had already purchased mobile sets much earlier to issuing of the
orders. Director(O) assured that he would consider our request. The issues
arising on account of billing problems between BSNL and MTNL in respect of
Service connections for those officials of BSNL living in service area of
MTNL and vice versa was also discussed. Director(O) informed that he is in
close touch with the concerned officers of MTNL Management and is confident
of resolving this issue very shortly.
Meeting of the United forum
of executives of BSNL and MTNL:
All the Associations of
executives of BSNL and MTNL met to chalk out future organizational strategy
on the issue of ITS absorption. Very shortly, a comprehensive organizational
plan of action will be communicated to the field units to ensure that the
issue of absorption attains finality. Field units of SNEA(I) must start
gearing up to respond to the decisions of the united forum of executives of
BSNL and MTNL to effectively and successfully implement the hard decisions
that are expected to be taken just within a couple of days.
DA
on IDA pay scale increased by 6.2% . DPE order endorsed by BSNL for payment
.>>>>>>>>>
Congratulations! The order relating to
AAO's Pay scale has been issued by BSNL Corporate office. Our constant
persuasion and regular monitoring of the issue yielded the desired results. We are very much
thankful to our Comrades of Account and Finance Wing, Director(Finance), PGM(FP), GM
(SR) and GM(EF) for their support.<<Click
Order>>
17th
Oct.08: Meeting with Secy/DOT
GS, AGS, COM Khan, President/AIBSNL
EA and GS/AIBSNL EA met Secy/DOT to impress upon him to ensure that the
existing process of absorption of ITS Gr A reaches conclusive stage by the
stipulated date so that the prolonged uncertainty created in BSNL on
account of non resolution of absorption issue which is adversely affecting
its growth is put to an end. We also conveyed the serious concern and
anxiety of the grass root membership throughout the Country because of
continuing delay in ending the prevailing uncertainty, and very strongly
pleaded with Secy/DOT to take all possible steps towards completion of the
process by due date. Secy/DOT said that the Govt. is fully seized of the
matter and shall try to resolve the issue within decided time frame.
Discussion with DDG(E)/DOT
regarding deferred option to continue in CDA pay scale till date of
promotion/retirement:
We were informed by DDG(E) that for the first time he got
some positive indications from Jt Secy/DPE regarding resolution of the
issue. Secy/DPE informed DDG(E) to come for a discussion in the coming week
to resolve the issue finally. DDG(E) sounded quite optimistic about
resolution of the issue shortly and assured us that this week he along with
other concerned officers of DOT shall hold discussions with the Jt Secy/DPE
ti find out some way to resolve the issue.
Discussion with Jt DDDG(P)/BSNL
regarding posting of JTOs on promotion to SDEs against competitive quota:
GS and AGS,
Com Khan, held extensive discussion regarding the criterion to be adopted
for posting of JTOs on promotion to SDEs against competitive quota and
requested him to consider the requests of transfer of JTOs on promotion to
SDEs. Besides, other important inputs were given by us. Jt DDG(P) assured
that our suggestions would be given due consideration while finalizing
posting of JTOs on promotion.
United Forum of BSNL Executives Association
writes to Director (HRD) onImposition of restictions in terms of
educational qualification and age unwarranted and untenable-LDCE to fill 25%
MT posts.<<<< Click Here>>>>>>
United Forum of BSNL Executives Association
writes to Director (HRD) onRepeated
breach of assurance transfer of 119 SDEs<<<Click
Here>>>
MEETING
WITH JT/SECY( DOT) : GS, President/AIBSNL EA and GS/AIBSNL EA met Joint Secy/
DOT to know the latest staus on ITS absorption and the future strategy of
DOT to overcome any difficult situation that may arise in the event of mass
exodus of ITS officers to DOT. Jt Secy informed us that DOT is maintaining a
very close monitoring of the whole issue, taking into account all the
connected aspects of the absorption issue. On the issue of merger of BSNL
and MTNL, Jt Secy informed that some preliminary positive developments are
taking place on this issue.
MEETING WITH SECY/DPE: GS, President/AIBSNL EA and GS/AIBSNL EA met Secy/DPE to know
from him the actual and latest position relating to the 2nd pay
panel. Secy/DPE informed us that Committee of Secretaries (COSs) constituted
by the Govt. to sort out divergent views expressed by many ministries of
various CPSUs are treating the whole issue on utmost priority and already
have had extensive discussions quite recently. Further discussions of the
COSs to come to a consensus view are expected to be held very shortly. Secy/DPE
clearly and categorically stated that the Union Cabinet is going to take
final decision very shortly, not exceeding 30th Nov.,08. On the
issue of grant of Navratna status to BSNL, Secy/DPE said that a favourable
decision is expected very soon and that he is quite supportive on this
specific issue.
MEETING
WITH MEMBER (F)/DOT: GS, President/AIBSNL EA and GS/AIBSNL EA met Member (F)/DOT
to get first hand information about the status of 2nd pay panel
report of CPSUs since he represented DOT in the meeting of Committee of
Secretaries ( COSs) convened by the Cabinet Secretary recently to obtain the
views of the administrative ministries of CPSUs on the recommendations of
the 2nd pay panel. Member(F) informed us that things are shaping
and progressing in a positive direction and that he is confident that the
Govt. will take final decision on the report within a month’s time, after
COSs takes a final view on some of the contentious issues raised by various
administrative ministries of CPSUs. Many CPSUs through their administrative
ministries are understood to have expressed diverse views on some of the
important recommendations of the 2nd pay panel.
It is reliably learnt from Circle office Rajasthan that the writ petition
No. 4796/2007 filed by some JTOs stands disposed off today. The
sincere persuasion of SNEA(I) CHQ and Rajasthan circle yield the fruitful
result in paving away the hurdles in the issuance of TES.Grp-B promotion
order
under 25%LDCE quota.
Most Important/Very Urgent
All the Circle secretaries are requested to send
the consolidated information in below mentioned prescribed proforma in excel
sheet regarding (1) Arrival (2) Departure for all the Delegates / CWC
Members /C.Ss /CHQ office bearers of their Circle who are attending the AIC
at Vadodara-Gujarat before 10th November-2008 on the below mentioned e-mail
addresses,
We learn that Director (HRD) has accorded his approval for filling up 1354
STS posts on adhoc basis.
Discussion
with Jt DDG(P):
GS and AGS, Com A.
Khan, met Jt DDG(P) and asked him to take expeditious action to restore back
the seniority of 1966 TES Gr B officers in accordance to the judgments of
Ernakulam and Delhi High Courts. He informed that action has already started
in this regard and assured that the issue would be treated on utmost
priority. Expediting JTO to TES Gr B DPC against seniority cum fitness quota
was also discussed.
Status
of issuing promotion orders against competitive quota:
With regard to stay granted by Hon’ble High Court of Rajasthan in respect of
competitive examination, Association is exploring the possibility of getting
impleaded in the Court case to get the stay vacated in Rajasthan High Court.
Discussion
with DDG (Trg):
The
issue of inadequacy of seats in ALTTC for imparting E2 to E3 training was
discussed and the instances of UP(E) and kerala circle were cited. We
informed DDG(TRG) that unless some urgent steps are taken by allowing RTTCs
also to impart E2 to E3 training, a very serious situation is definitely
going to occur in March ,09 when a very huge number of executives would be
waiting to get trained because of inadequacy of seats. We appeal to CSs
to find out the exact position in their respective Circles in this regard.
However, DDG(Trg) assured that he is already seized of the matter and is in
constant touch with the concerned authorities in ALTTC Ghaziabad.
Discussion
with DDG (E)/BSNL:
Constitution
of committee to sort out the ACP issue of Civil/Electrical etc. on the lines
suggested by us was discussed. We informed DDG(E) that the executives
working in Civil/Electrical etc are suffering very badly because of the
arbitrary order of Feb.,08, withdrawing the benefit of ACP scheme. DDG(E)
assured that action on the lines suggested by us recently i.e constitution
of committee is being considered to resolve the issue.
Discussion with DDG(EF),BSNL:
We
pointed out that there was considerable delay in issuing orders in
connection with AAO’s payscale. We were informed that file has just come
from SEA section and very soon we will send the file back and ensure
that the orders are issued at the earliest.
The issue of tax on perquisites for 2008-09
was also discussed and it was informed that the net financial implication is
being worked out and efforts are on to ensure that BSNL may pay additional
liability as done before.
The file relating to revision of pension for
the employees who have retired before 1.1.2007 and drawing IDA pension has
been sent back from DoT to BSNL with a list of objections. We will once
again take this issue with DoT very
soon.
GS
Writes to Director (HRD) on
Total revamping of LDCE (Limited Departmental Competitive
Examination) - for promotion from JTO to TES Gr B against 1/3rd
TES Gr B vacancies .<<Click
Here>>
GS
Writes to Director (HRD) onRequest for change
of place of posting in promotion from SDE to STS.
<< Click Here>>
GS
Writes to GM (Trg) onTotal inadequacy of availability of seats at ALTTC to
complete E2 to E3 training within stipulated time frame.<<
Click Here>>
GS
Writes to Director (HRD) on ACP
Scheme – Adverse impact of clarification issued vide No. 25- 4/2006-Pers.II
dated 20.08.2007. – Need to immediately re-examine and resolve the issue in
totality, at the earliest.<<<Click here>>>>>
GS
Writes to Director (HRD) on Immediate
restoration of seniority of 1966 TES Gr B officers– regarding.<<<<Click
Here>>>>
GS
Writes to Director (HRD)
on Irregular
and incredible marking pattern observed in paper II of TES Gr B competitive
examination .<<<Click
Here>>
Our
association which has exclusively taken up the issue relating to simple
accounts examination in the cadre of Civil and Electrical has met
success as the same has been approved by the competent
authority. The approval says that instead a two week training will be
conducted at RTTCs and ALTTC followed by an examination i.e
examination will be an integral part of training. We had received an
overwhelming response on this issue specifically from all the southern
Circles, WB, GJ,PB, UP(E),UP(W) ,MP etc. CHQ is extremely
thankful for their support and exemplary patience. We are hopeful for more
pragmatic decisions in Civil/Electrical Wing. Necessary orders will be issued
very soon.
On ACP
issue we have received various representations across the country. This
issue is causing serious heartburning to our comrades. Our GS is fully
apprised on the issue and very shortly GS will address the issue with a new
thrust & dimension.>>>>>>>>>>
Issue
of 25 % competitive Examination.:The petitioners in Hon'ble Jaipur
high court were called by DGM(Pers.) & GM(Pers.) at Corporate office. In the
meeting they said that their concern was seniority in the cadre not
the staying of promotion (Competitive quota). Management has requested them to
submit a declaration on the account. We are hopeful that things will be
settled very soon.
As assured the orders relating to JAO/AAO to AO have been issued after
prolong persuasion. We have tried to ensure that maximum no. of candidates
are posted in the same Circle. Congratulations to all of them.>>>>>>>>>
7th
Oct.,08: Meeting with Director (HRD) /BSNL:
GS along with Com Ballab Bose, CS/UP(E), met Director(HRD)
and discussed following issues elaborately. DDG(P) and Jt DDG(P) were also
present in the meeting.
A)Finalization of Gr A RRs based on the agreement with the united forum of
executives of BSNL: We impressed upon
Director(HRD) to take immediate action to promulgate Gr A RRs in line with
the understanding reached with the united forum of executives. Besides, we
informed Director(HRD) that some of the aspects of RRs like qualification,
age etc. for internal competitive examination for MTs which were left
uncovered in the understanding and on which we were specifically assured of
discussion at the time of framing and promulgation of Gr A RRs need to be
discussed. Director(HRD) assured of further discussion on these issues very
shortly.
B)Holding of DPC from TES Gr B to adhoc STS: Director(HRD) directed
DDG(P) to initiate immediate action to fill up about 1500 STS posts on adhoc
basis. DDG(P) assured that action to initiate DPC would be taken very
shortly.
C)Expediting holding of seniority cum fitness DPC from JTO to TES Gr B:
DDG(P) informed Director(HRD) that practically no Circle has sent so far the
information that BSNL hqs has sought for in regard to correction of EL
circulated by Hqs. However, DDG(P) informed Director(HRD) that within ten
days heads of Circles would be asked to send the CRs for processing and
going ahead with the seniority cum fitness DPC. Director(HRD) directed DDG(P)
to treat this issue on utmost priority.
D)Restoration of seniority of 1966 SDEs: We very strongly protested
over the delay in restoring the seniority of 1966 SDEs despite clear cut
Court directions from Ernakulam and Delhi High Courts, quashing reversion of
these 1966 SDEs. DDG(P) categorically assured that within fifteen days
action to restore the seniority of 1966 SDEs would be taken.
E)Issuing of promotion orders from JTO to TES Gr B against competitive
quota: DDG(P)
informed that he is making best efforts to issue the orders as early as
possible and is in constant touch with the legal cell of BSNL Hqs to break
the impasse created by direction issued by Rajasthan High Court. We urged
upon Director(HRD) to expedite issuing of orders by taking appropriate
action. We also informed Director (HRD) that if things are delayed too much,
then Association will get impleaded in Rajasthan High Court.
4th/5th
Oct.,08: 21st Circle Conference of TN
Circle at Thanjavur:
21st Circle Conference of TN Circle was held at
Thanjavur on 4th/5th Oct.,08 in a colorful manner,
with more than 600 members attending the open session on the evening of 4th
Oct.,08. The open session was addressed by the CSs of BSNL EU, NFTE, TEPU,
FNTO, DGM(A)/TN Circle
and GM/Thanjavur. Veteran Comrade, W. Seshagiri Rao, president/NCOA, CHQ
President, Com S.L.Reddy, and GS also addressed the open session. All the
speakers emphasized upon the need of continuous and sustained struggle from
the platform of Jt forum on issues of viability of BSNL. Key note address
was read out by Com N. Balakrishnan, CS/TN Circle.
GS addressed the delegate session on the morning of 5th
Oct.,08 and apprised the representative council about latest developments on
various cadre and other issues. GS’s address was followed by an interactive
session. Role of CHQ on the issue of 147 SDEs getting retrospective
seniority came in for criticism. However, GS, after explaining all the facts
relating to the issue, assured the representative council of seeking to
explore various options, including the legal one, to protect the interest of
seniors. Com Sunder krishnan, Com Ashokan and Com Jayraman were unanimously
elected President, CS and treasurer respectively.
3rd
October, 08; GS
addressed GB meeting of Chennai/TD.
GB meeting of Chennai/TD was addressed by the GS on the
evening of 3rd Oct.,08 in which GS elaborately mentioned the
latest position on various issues and the stand of the Association. CHQ
President, Com S.L.Reddy, and treasurer, Com Muthu, also addressed the GB
meeting. The meeting was presided over by Com Munuswamy, President of the
Chennai/TD Organization.
The stand of the CHQ on the issue of giving retrospective
seniority to 147 SDEs and promoting about 50 of them to STS came in for
severe criticism. Despite explaining of facts by GS, particularly in the
context of judgments from various High Courts and Supreme Court, the members
wanted Association to explore possibility of legal action, since it was felt
that a flood gate would be opened by such retrospective promotions which
would adversely affect the seniority of seniors in future. GS also explained
in detail the helplessness of the Association on the issue of fixation of
TES Gr B seniority in view of innumerable court cases being filed on the
issue. However, GS assured the members that Association would further try to
explore taking legal action on the issue to protect the interest of the
seniors who are adversely affected by such retrospective seniority fixation.
The
file relating to AAOs Pay scale was with SEA branch till 3rd of October
2008. It was referred by EF branch for their comments on the issue with the
reason that SEA branch is the nodal branch dealing with the issue. We are
surprised as why the file was sent to SEA branch as the nodal branch was SR
branch which has dealt the issue. Unnecessary delay has already taken by
tossing the file from one branch to the other, as the approval for the same
has come long back from DoT. We strongly feel and protest the delay in
approval of AAOs payscales.
The
orders relating to AO DPC are expected next week. All the request transfers
will be carried out and there will be minimum disturbance in the orders. We
are hopeful that all the request transfers will in accordance with some
decided policy.
Status of promotion of 25 % competitive examination: The necessary
details of the all the qualified candidates & VC have been compiled by the
personnel-II branch. The Promotions to the qualified candidates is a bit
delayed due to the so called stay in the Hon'ble Jaipur bench of
Rajasthan high court by a writ petition no.
4796/2007 filed by
one of the executive association. There is an element of ambiguity in terms
of applicability of stay. Concerned GM(Pers.) & DGM(Pers.) are totally
seized of the issue as a total of 1867 candidates have passed the exam. and
out of which more than 800 BSNL recruitee JTOs have been declared successful in
the same examination. We have also demanded that the promotion orders may be
issued at the earliest as the stay was granted by the Hon'ble Court till the
next hearing i.e 17.9.07. The matter has been referred to GM(legal) by the
GM(Pers.) for finding a solution in this regard.
The
information given on this site is restricted to SNEA (I) members only. The
content of the pages of this site shall not be quoted or reproduced as an
evidence elsewhere either in part or full for any purpose.